# Case Study: Renault Tanger — Production Ramp Execution

**Client:** Renault-Nissan Tanger (Melloussa site)  
**Scope:** Usine design + montée en cadence 0 → 400 units/day  
**Timeline:** 18 months  
**Result:** On-schedule, on-budget, zero production stoppages  

## Intervention
- Site engineering (flux conception, in-plant logistics)
- iFA automation design & setup
- SPR standards deployment  
- Production ramp management (0→100→250→400 units/day)

## Key Achievements
- Montée en cadence on-schedule (vs typical +20% delay)
- Zero production stops (vs industry 15-20% downtime)
- Efficiency >95% (vs 85% typical)
- 2,000+ jobs created

---

**Essor Consulting** — Manufacturing & Production Planning